Energy Storage System (ESS) Install, Modification & Operation.

Fee for a new Energy Storage System (ESS) new or modification is $100.00

Checks may be dropped off in the drop box at the Station, 11 Pierce Street or may be mailed to:

Northborough Fire Department 11 Pierce St. Northborough MA. 01532 

Please make sure to address the Envelope to Northborough Fire Department and include the Owners name, Address of the Property, and the name of the company doing the work

Applicants must submit an application to the Northborough Building Department PRIOR to applying for this Fire Department Permit or you will not have the necessary information needed to complete this application.

All required documents and drawings shall be submitted to the Northborough Building Department

Documents, design, install and operations must comply with all applicable sections of:

  • 527 CMR 1.00
  • 527 CMR Chapter 52
  • NFPA 855
  • 780 CMR

Additional local requirements can be found by clicking on the link below

Local Requirements

 
1 Start 2 Complete
If the answer to the above is yes please complete the following two fields