ARTICLE 31 (CIP): MELICAN MIDDLE – Pneumatic Control Repairs

To see if the Town will vote to appropriate the sum of Seventy-Two Thousand Dollars ($72,000) for repairs to the pneumatic controls at the Robert E. Melican Middle School, including all costs incidental and related, and to meet said appropriation transfer from the surplus balance in Article 28 from the April 2011 Annual Town Meeting for Robert E. Melican Middle School Green Repairs.
− The Public Schools of Northborough has identified the air pressure-based pneumatic control needs restoration. The air pressure provided to each univent heating unit controls the outside air dampers and hot water valves that support the heating system. By restoring the air pressure to consistent levels, the system will work more efficiently and can be calibrated to support a more comfortable learning environment. The restoration of air pressure to the three floors of Robert E. Melican Middle School will add efficiency and comfort to the building.

For further explanation of this article, please watch this video
clip on Northborough Cable's YouTube Channel:

c